In the developing stage of Big Screens project


This is my current status of BigScreen project which will be displayed on wall screen at IAC building on Dec. 4.

  1. Sound editing
  2. Visual design
  3. Storyboarding
  4. Sound analysis for synchronizing animation to sound
  5. 34 seconds animation


I started the idea as an interactive animation for this project using computer vision. However, there are constraints for the idea; The IAC doesn’t allow us to use their cameras installed above the wall screen. And at least 300 people are expected to be at the show, which would cause serious problems in precise and subtle tracking of people and installing my own cameras in the space. All these constraints made me go to plan B, the linear animation.


These are still images of my animation.